This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on large scale grids, made up of interconnected clusters of heterogeneous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline requirements, and optimizing the utilization of hardware resources as well as software resources.
A two level scheduler to dynamically a strean of batch jobs in large scale grids
Ricci, Laura;
2008-01-01
Abstract
This paper describes the study conducted to design and evaluate a two-level on-line scheduler to dynamically schedule a stream of sequential and multi-threaded batch jobs on large scale grids, made up of interconnected clusters of heterogeneous machines. The scheduler aims to schedule arriving jobs respecting their computational and deadline requirements, and optimizing the utilization of hardware resources as well as software resources.File in questo prodotto:
Non ci sono file associati a questo prodotto.
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.