The evolution of the process industry in the direction of automation and digitalization is nowadays a consolidated phenomenon. In this direction, Industry 4.0 paradigms are leading many industrial companies to significantly update their facilities. This paper presents a scheduling algorithm that takes the role of a real-time optimization (RTO) element in a larger project framework where the various network components are aimed to be all highly interconnected. The proposed methodology is applied to an Italian chemical industrial site, in order to best manage the production rates of the various products and the sales plan for the different clients. Numerous plants and processes are considered into the model: batch and continuous production lines, saleable and non-storable products. Concepts of linear optimization and batch operation scheduling are used in the algorithm construction. This whole structure lays the foundation for a full integration between different elements of the facility, that is, the control systems and the selling department.

Implementation of an Industry 4.0 system to optimally manage chemical plant operation

Marco Vaccari;Riccardo Bacci di Capaci;Elisabetta Brunazzi;Leonardo Tognotti;Gabriele Pannocchia
2020-01-01

Abstract

The evolution of the process industry in the direction of automation and digitalization is nowadays a consolidated phenomenon. In this direction, Industry 4.0 paradigms are leading many industrial companies to significantly update their facilities. This paper presents a scheduling algorithm that takes the role of a real-time optimization (RTO) element in a larger project framework where the various network components are aimed to be all highly interconnected. The proposed methodology is applied to an Italian chemical industrial site, in order to best manage the production rates of the various products and the sales plan for the different clients. Numerous plants and processes are considered into the model: batch and continuous production lines, saleable and non-storable products. Concepts of linear optimization and batch operation scheduling are used in the algorithm construction. This whole structure lays the foundation for a full integration between different elements of the facility, that is, the control systems and the selling department.
File in questo prodotto:
File Dimensione Formato  
IFAC20_1594_FI.pdf

accesso aperto

Tipologia: Documento in Post-print
Licenza: Creative commons
Dimensione 509.75 kB
Formato Adobe PDF
509.75 kB Adobe PDF Visualizza/Apri
1-s2.0-S2405896320309381-main.pdf

accesso aperto

Tipologia: Versione finale editoriale
Licenza: Creative commons
Dimensione 1.42 MB
Formato Adobe PDF
1.42 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11568/1065062
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 14
  • ???jsp.display-item.citation.isi??? 10
social impact