A multidisciplinary approach for the design of geothermal power plants for water dominant resources is here proposed. The importance of a strategic approach is underlined, considering all the connections between the analysis of the geothermal potential of the reservoir (geophysical exploration and geochemical analysis) with the design of the plant based on thermodynamic and energy considerations, mainly regarding ORC (Organic Rankine Cycles) power plants.This multidisciplinary approach is fundamental for the objective of a sustainable exploitation of medium to low enthalpy sources. The aim of this study is to propose the optimization and management of the global system " reservoir-power plant" as the task of geothermal projects.This approach can be pursued only in a multidisciplinary perspective in which both Engineering and Geological aspects are involved. Numerical simulation appears to be an essential interacting step. After analyzing the problems caused by an incorrect characterization of geothermal source, reinjection temperature and strategy, a method for the numerical simulation of geothermal reservoirs long-term behavior/capacity is discussed. This could be the key instrument to synthesize the strategy inputs. A numerical modeling is performed, using as reference data the history matching of a well known and completely analyzed geothermal field.

An integrated "Reservoir-Plant" strategy for a sustainable and efficient use of geothermal resources

FRANCO, ALESSANDRO;
2012-01-01

Abstract

A multidisciplinary approach for the design of geothermal power plants for water dominant resources is here proposed. The importance of a strategic approach is underlined, considering all the connections between the analysis of the geothermal potential of the reservoir (geophysical exploration and geochemical analysis) with the design of the plant based on thermodynamic and energy considerations, mainly regarding ORC (Organic Rankine Cycles) power plants.This multidisciplinary approach is fundamental for the objective of a sustainable exploitation of medium to low enthalpy sources. The aim of this study is to propose the optimization and management of the global system " reservoir-power plant" as the task of geothermal projects.This approach can be pursued only in a multidisciplinary perspective in which both Engineering and Geological aspects are involved. Numerical simulation appears to be an essential interacting step. After analyzing the problems caused by an incorrect characterization of geothermal source, reinjection temperature and strategy, a method for the numerical simulation of geothermal reservoirs long-term behavior/capacity is discussed. This could be the key instrument to synthesize the strategy inputs. A numerical modeling is performed, using as reference data the history matching of a well known and completely analyzed geothermal field.
2012
Franco, Alessandro; Vaccaro, M.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11568/158513
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 41
  • ???jsp.display-item.citation.isi??? 31
social impact