In this paper, an innovative framework to apply Value Stream Mapping to products with complex Bill of Materials is presented. Value Stream Mapping is one of the best tools to map a process and to identify its main criticalities. Unfortunately, it can be effectively applied to linear systems only. When the manufacturing process is complex with flows merging together, Value Stream Mapping cannot be used straightforwardly. Thus, the main objective of this work is to solve this limitation so that lean production can be enhanced in complex systems too. The proposed approach is based on seven iterative steps and integrates Value Stream Mapping with other tools typical of industrial engineering. The basic idea is to execute a preliminary analysis to identify the 'critical production path using the Temporized Bill of Material. Then, improvements are made considering all possible sharing with other secondary paths as possible constraints. Once the critical path has been optimized, a new path may become critical. Thus, the analysis proceeds iteratively until the optimum is reached and the Work In Process level has decreased under a desired value. A case study taken from a real setting environment is finally presented to assess the validity of the methodology proposed here.

A new Value Stream Mapping approach for complex production systems

BRAGLIA, MARCELLO;CARMIGNANI, GIONATA;
2006-01-01

Abstract

In this paper, an innovative framework to apply Value Stream Mapping to products with complex Bill of Materials is presented. Value Stream Mapping is one of the best tools to map a process and to identify its main criticalities. Unfortunately, it can be effectively applied to linear systems only. When the manufacturing process is complex with flows merging together, Value Stream Mapping cannot be used straightforwardly. Thus, the main objective of this work is to solve this limitation so that lean production can be enhanced in complex systems too. The proposed approach is based on seven iterative steps and integrates Value Stream Mapping with other tools typical of industrial engineering. The basic idea is to execute a preliminary analysis to identify the 'critical production path using the Temporized Bill of Material. Then, improvements are made considering all possible sharing with other secondary paths as possible constraints. Once the critical path has been optimized, a new path may become critical. Thus, the analysis proceeds iteratively until the optimum is reached and the Work In Process level has decreased under a desired value. A case study taken from a real setting environment is finally presented to assess the validity of the methodology proposed here.
2006
Braglia, Marcello; Carmignani, Gionata; Zammori, F.
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11568/181093
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 227
  • ???jsp.display-item.citation.isi??? 148
social impact