Despite being the most used worldwide, railway ballasted tracks presents high maintenance cost related to ballast settlement and particle degradation. With the aim of reducing life cycle costs, bitumen stabilised ballast (BSB) has been recently proposed as a relatively cheap alternative maintenance solution to be applied to existing tracks. This study aims at assessing the potential advantages of this technology, defining a novel maintenance strategy of traditional ballasted track-beds. A protocol for the application of the BSB technology and its associated maintenance strategy is defined. To estimate minor and major maintenance operations of BSB scenario in comparison to traditional ballasted track-bed, an integrated model, based on laboratory tests, combining the evolution of track irregularities and ballast contamination with traffic, was used. Results together with a sensitivity analysis related to main parameters adopted revealed that the application of BSB is expected to provide a significant increase of intervals between both minor and major maintenance activities.

Novel performance-based technique for predicting maintenance strategy of bitumen stabilised ballast

Bressi, Sara
Secondo
;
2018-01-01

Abstract

Despite being the most used worldwide, railway ballasted tracks presents high maintenance cost related to ballast settlement and particle degradation. With the aim of reducing life cycle costs, bitumen stabilised ballast (BSB) has been recently proposed as a relatively cheap alternative maintenance solution to be applied to existing tracks. This study aims at assessing the potential advantages of this technology, defining a novel maintenance strategy of traditional ballasted track-beds. A protocol for the application of the BSB technology and its associated maintenance strategy is defined. To estimate minor and major maintenance operations of BSB scenario in comparison to traditional ballasted track-bed, an integrated model, based on laboratory tests, combining the evolution of track irregularities and ballast contamination with traffic, was used. Results together with a sensitivity analysis related to main parameters adopted revealed that the application of BSB is expected to provide a significant increase of intervals between both minor and major maintenance activities.
2018
D'Angelo, Giacomo; Bressi, Sara; Giunta, Marinella; Lo Presti, Davide; Thom, Nick
File in questo prodotto:
File Dimensione Formato  
Novel performance-based technique for predicting maintenance strategy.pdf

solo utenti autorizzati

Tipologia: Versione finale editoriale
Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 1.53 MB
Formato Adobe PDF
1.53 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11568/944905
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 36
  • ???jsp.display-item.citation.isi??? 31
social impact