This work analyses the consequences that the desaturation manoeuvres can have on the precise orbit determination corresponding to the Mercury Orbiter Radioscience Experiment (MORE) of the BepiColombo mission to Mercury. This is an ESA/JAXAjoint project with challenging objectives regarding geodesy, geophysics and fundamental physics. We will show how these manoeuvres affect the orbit of the s/c and the radio science measurements and how to include them in the orbit determination and parameter estimation procedure. The non-linear least-squares fit is applied on a set of observational arcs separated by intervals of time where the probe is not visible. With the current baseline of two ground stations, two manoeuvres are performed per day, one during the observing session and the other in the dark. To reach the scientific goals of the mission, they have to be treated as 'solve for quantities'. We developed a specific methodology based on the deterministic propagation of the orbit, which is able to deal with these variables, by connecting subsequent observational arcs in a smooth way. The numerical simulations demonstrate that this constrained multi-arc strategy is able to determine all the manoeuvres together with the other parameters of interest at a high level of accuracy.

Desaturation manoeuvres and precise orbit determination for the BepiColombo mission

MILANI COMPARETTI, ANDREA;TOMMEI, GIACOMO
2012-01-01

Abstract

This work analyses the consequences that the desaturation manoeuvres can have on the precise orbit determination corresponding to the Mercury Orbiter Radioscience Experiment (MORE) of the BepiColombo mission to Mercury. This is an ESA/JAXAjoint project with challenging objectives regarding geodesy, geophysics and fundamental physics. We will show how these manoeuvres affect the orbit of the s/c and the radio science measurements and how to include them in the orbit determination and parameter estimation procedure. The non-linear least-squares fit is applied on a set of observational arcs separated by intervals of time where the probe is not visible. With the current baseline of two ground stations, two manoeuvres are performed per day, one during the observing session and the other in the dark. To reach the scientific goals of the mission, they have to be treated as 'solve for quantities'. We developed a specific methodology based on the deterministic propagation of the orbit, which is able to deal with these variables, by connecting subsequent observational arcs in a smooth way. The numerical simulations demonstrate that this constrained multi-arc strategy is able to determine all the manoeuvres together with the other parameters of interest at a high level of accuracy.
2012
Alessi, E. M.; Cicalò, S.; MILANI COMPARETTI, Andrea; Tommei, Giacomo
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11568/153524
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 26
  • ???jsp.display-item.citation.isi??? 22
social impact